RENCANA ANGGARAN BIAYA ( PEKERJAAN MEKANIKAL ELEKTRIKAL )

No. Deskripsi Pekerjaan Volume  Satuan   Harga Satuan   Jumlah Harga 
             
A.   PEKERJAAN LANTAI 01        
             
A.1 INSTALASI TITIK LAMPU DAN STOP KONTAK        
  1 instalasi lampu TL      4.00 ttk  Rp        450,000.00  Rp    1,800,000.00
  2 instalasi lampu downlight   20.00 ttk  Rp        175,000.00  Rp    3,500,000.00
  3 instalasi lampu PLC      5.00 ttk  Rp        125,000.00  Rp        625,000.00
  4 instalasi stop kontak      8.00 ttk  Rp        250,000.00  Rp    2,000,000.00
          JUMLAH A.1.  PEK. INSTALASI TITIL LAMPU & STOP KONTAK  Rp    7,925,000.00
A.2 INSTALASI AIR KOTOR        
  1 Jaringan pipa 4 Inch   20.00 m1  Rp          80,000.00  Rp    1,600,000.00
  2 Jaringan pipa 3 Inch   20.00 m2  Rp          70,000.00  Rp    1,400,000.00
  3 jaringan pipa 1.5 Inch   15.00 m3  Rp          50,000.00  Rp        750,000.00
          JUMLAH A.2.  PEK. INSTALASI AIR KOTOR  Rp    3,750,000.00
A.3 INSTALASI AIR BERSIH        
  1 Jaringan Pipa 3/4 Inch   40.00 m1  Rp          45,000.00  Rp    1,800,000.00
          JUMLAH A.3.  PEK. INSTALASI AIR BERSIH  Rp    1,800,000.00
A.4 INSTALASI AIR HUJAN        
  1 Saluran Air hujan   35.00 m1  Rp        275,000.00  Rp    9,625,000.00
          JUMLAH A.4.  PEK. INSTALASI AIR HUJAN  Rp    9,625,000.00
          JUMLAH  PEKERJAAN LANTAI 01  Rp  23,100,000.00
B   PEKERJAAN LANTAI 02        
             
B.1 INSTALASI TITIK LAMPU DAN STOP KONTAK        
  1 Instalasi Lampu Downlight   15.00 ttk  Rp        175,000.00  Rp    2,625,000.00
  2 Instalasi Stop kontak      6.00 ttk  Rp        250,000.00  Rp    1,500,000.00
          JUMLAH B.1.  PEK. INSTALASI TITIL LAMPU & STOP KONTAK  Rp    4,125,000.00
B.2 INSTALASI AIR HUJAN        
  1 Instalasi Air hujan   15.00 m1  Rp          80,000.00  Rp    1,200,000.00
          JUMLAH B.2.  PEK. INSTALASI AIR HUJAN  Rp    1,200,000.00
          JUMLAH  PEKERJAAN LANTAI 02  Rp    5,325,000.00
C   PEKERJAAN LANTAI 3        
C.1 INSTALASI WATER TORN        
    Instalasi watertorn      2.00 unit  Rp    3,500,000.00  Rp    7,000,000.00
          JUMLAH C.1.  PEK. INSTALASI AIR HUJAN  Rp    7,000,000.00
          JUMLAH  PEKERJAAN LANTAI 03  Rp    7,000,000.00
D   PEKERJAAN LAIN-LAIN        
           
  1 Box Panel Listrik      1.00 unit  Rp    7,500,000.00  Rp    7,500,000.00
  2 Instalasi Listrik Outdoor      1.00 unit  Rp    5,000,000.00  Rp    5,000,000.00
          JUMLAH D.  PEK. LAIN-LAIN  Rp  12,500,000.00
          JUMLAH  PEKERJAAN LAIN-LAIN  Rp  12,500,000.00
GRAND TOTAL (Belum Termasuk Jasa dan Pajak)  Rp  47,925,000.00
             

RENCANA ANGGARAN BIAYA ( PEKERJAAN ARSITEKTUR )



No. Deskripsi Pekerjaan Volume  Satuan   Harga Satuan   Jumlah Harga 
I. PEKERJAAN LANTAI 01
I.1 PEKERJAAN TANAH
1 Galian Tanah untuk Pondasi Batu Kali & Sloof Praktis          8.00 m3  Rp          30,000.00  Rp             240,000.00
2 Urug Tanah kembali          6.00 m3  Rp          15,000.00  Rp               90,000.00
JUMLAH I.1.  PEKERJAAN TANAH  Rp             330,000.00
I.2 PEKERJAAN BETON NON STRUKTURAL 
1 Kolom Praktis          2.52 m3  Rp    3,221,875.00  Rp         8,133,623.44
2 Balok Latai          0.65 m3  Rp    3,221,875.00  Rp         2,078,109.38
JUMLAH I.2.  PEKERJAAN BETON NON STRUKTURAL  Rp       10,211,732.81
I.3 PEKERJAAN PASANGAN
1 Pasang Pondasi Batu Kali          9.60 m3  Rp        335,000.00  Rp         3,216,000.00
2 Pasang Dinding Batu Bata      275.94 m2  Rp          92,500.00  Rp       25,524,450.00
JUMLAH I.3.  PEKERJAAN PASANGAN  Rp       28,740,450.00
I.4 PEKERJAAN PENUTUP DINDING
1 Plesteran & Acian      551.88 m2  Rp          47,500.00  Rp       26,214,300.00
2 Keramik Dinding        39.78 m2  Rp        225,000.00  Rp         8,949,375.00
3 Pasang List Keramik Dinding        21.50 m'  Rp        155,000.00  Rp         3,332,500.00
4 Finishing Beton        68.60 m2  Rp          35,000.00  Rp         2,401,000.00
JUMLAH I.4.  PEKERJAAN PENUTUP DINDING  Rp       40,897,175.00
I.5 PEKERJAAN PLAFOND
1 Pasang Plafond beserta Rangka      106.75 m2  Rp          85,000.00  Rp         9,073,750.00
2 Pasang List Plafond      100.00 m'  Rp          17,500.00  Rp         1,750,000.00
JUMLAH I.5.  PEKERJAAN PLAFOND  Rp       10,823,750.00
I.6 PEKERJAAN PENUTUP LANTAI
1 Pasang Penutup Lantai      126.95 m2  Rp        525,000.00  Rp       66,648,750.00
2 Pasang Penutup Lantai KM/WC        22.75 m2  Rp        275,000.00  Rp         6,256,250.00
3 Pasang Plint Lantai      125.00 m'  Rp        183,750.00  Rp       22,968,750.00
4 Pasang Penutup Lantai Tangga dan Bordes          9.13 m2  Rp        525,000.00  Rp         4,790,625.00
5 Pasang Plint Lantai Tangga dan Bordes        13.00 m'  Rp        183,750.00  Rp         2,387,831.25
6 Stepnosing Anak Tangga        20.00 m'  Rp        115,000.00  Rp         2,300,000.00
JUMLAH I.6.  PEKERJAAN PENUTUP LANTAI  Rp     105,352,206.25
I.7 PEKERJAAN CAT
1 Cat Dinding Interior      275.94 m2  Rp          27,500.00  Rp         7,588,350.00
2 Cat Dinding Exterior      380.34 m2  Rp          29,500.00  Rp       11,220,030.00
3 Cat Plafond      106.75 m2  Rp          27,500.00  Rp         2,935,625.00
4 Cat List Plafond      100.00 m'  Rp          12,500.00  Rp         1,250,000.00
JUMLAH I.7.  PEKERJAAN CAT  Rp       22,994,005.00
I.8 PEKERJAAN PINTU & JENDELA
1 Pekerjaan Kusen Jati  6/12 Jati Kw 1      126.80 m1  Rp        225,000.00  Rp       28,530,000.00
2 Pekerjaan Pintu Jati          8.00 unit  Rp    2,500,000.00  Rp       20,000,000.00
3 Pekerjaan Jendela kaca bevel bingkai jati          8.00 unit  Rp        975,000.00  Rp         7,800,000.00
JUMLAH I.8.  PEKERJAAN PINTU & JENDELA  Rp       56,330,000.00
I.9 PEKERJAAN PENGGANTUNG.PENGAIT DAN PENGUNCI
1 Ensel Pintu 4"         12.00 psg  Rp        100,000.00  Rp         1,200,000.00
2 Ensel jendela 3"        16.00 psg  Rp          75,000.00  Rp         1,200,000.00
3 Lock case termasuk handle pintu          8.00 psg  Rp        450,000.00  Rp         3,600,000.00
4 Handle pintu Utama          2.00 psg  Rp    1,500,000.00  Rp         3,000,000.00
5 Hak angin        16.00 psg  Rp          50,000.00  Rp             800,000.00
6 Door stopper          8.00 pcs  Rp        150,000.00  Rp         1,200,000.00
JUMLAH I.9.  PEKERJAAN PENGGANTUNG & PENGUNCI  Rp       11,000,000.00
I.10 PEKERJAAN FINISHING KAYU
1 Finishing Melamin lack clear PU Kusen      126.80 m1  Rp          45,000.00  Rp         5,706,000.00
2 Finishing Melamin lack clear PU Daun Pintu          8.00 unit  Rp        425,000.00  Rp         3,400,000.00
3 Finishing Melamin lack clear PU Daun Jendela        16.00 unit  Rp        150,000.00  Rp         2,400,000.00
JUMLAH I.10.  PEKERJAAN FINISHING KAYU  Rp       11,506,000.00
I.11 PEKERJAAN SANITAIR
1 Closed Jongkok          2.00 unit  Rp        125,000.00  Rp             250,000.00
2 Floor Drain          6.00 unit  Rp          80,000.00  Rp             480,000.00
3 Kran Dinding        14.00 unit  Rp        175,000.00  Rp         2,450,000.00
JUMLAH I.11.  PEKERJAAN SANITAIR  Rp         3,180,000.00
JUMLAH  PEKERJAAN LANTAI 01  Rp     301,365,319.06
II. PEKERJAAN LANTAI 02
II.1 PEKERJAAN BETON NON STRUKTURAL 
1 Kolom Praktis          2.27 m3  Rp    3,221,875.00  Rp         7,307,212.50
2 Balok Latai          0.96 m3  Rp    3,221,875.00  Rp         3,093,000.00
JUMLAH II.1.  PEKERJAAN BETON NON STRUKTURAL  Rp       10,400,212.50
II.2 PEKERJAAN PASANGAN
1 Pasang Dinding Batu Bata      185.64 m2  Rp          92,500.00  Rp       17,171,700.00
JUMLAH II.2.  PEKERJAAN PASANGAN  Rp       17,171,700.00
II.3 PEKERJAAN PENUTUP DINDING
1 Plesteran & Acian      371.28 m2  Rp          47,500.00  Rp       17,635,800.00
2 Finishing Beton        68.60 m2  Rp          35,000.00  Rp         2,401,000.00
JUMLAH II.3.  PEKERJAAN PENUTUP DINDING  Rp       20,036,800.00
II.4 PEKERJAAN PLAFOND
1 Pasang Plafond beserta Rangka        70.00 m2  Rp          85,000.00  Rp         5,950,000.00
2 Pasang List Plafond        44.00 m'  Rp          17,500.00  Rp             770,000.00
JUMLAH II.4.  PEKERJAAN PLAFOND  Rp         6,720,000.00
II.5 PEKERJAAN PENUTUP LANTAI
1 Pasang Penutup Lantai        60.00 m2  Rp        525,000.00  Rp       31,500,000.00
2 Pasang Plint Lantai        59.00 m'  Rp        183,750.00  Rp       10,841,250.00
JUMLAH II.5.  PEKERJAAN PENUTUP LANTAI  Rp       42,341,250.00
II.6 PEKERJAAN CAT
1 Cat Dinding Interior      185.64 m2  Rp          27,500.00  Rp         5,105,100.00
2 Cat Dinding Exterior      185.64 m2  Rp          29,500.00  Rp         5,476,380.00
3 Cat Plafond        70.00 m2  Rp          27,500.00  Rp         1,925,000.00
4 Cat List Plafond        44.00 m'  Rp          12,500.00  Rp             550,000.00
JUMLAH II.6.  PEKERJAAN CAT  Rp       13,056,480.00
II.7 PEKERJAAN PINTU & JENDELA
1 Pekerjaan Kusen Jati  6/12 Jati Kw 1      138.45 m1  Rp        225,000.00  Rp       31,151,250.00
2 Pekerjaan Pintu Jati               -   unit  Rp    2,500,000.00  Rp                             -  
3 Pekerjaan Jendela kaca bevel bingkai jati        26.00 unit  Rp        975,000.00  Rp       25,350,000.00
JUMLAH II.7.  PEKERJAAN PINTU & JENDELA  Rp       56,501,250.00
II.8 PEKERJAAN PENGGANTUNG.PENGAIT DAN PENGUNCI
1 Ensel jendela 3"        26.00 psg  Rp          75,000.00  Rp         1,950,000.00
2 Hak angin        26.00 psg  Rp          50,000.00  Rp         1,300,000.00
JUMLAH II.8.  PEKERJAAN PENGGANTUNG & PENGUNCI  Rp         3,250,000.00
II.9 PEKERJAAN FINISHING KAYU
1 Finishing Melamin lack clear PU Kusen      138.45 m1  Rp          45,000.00  Rp         6,230,250.00
3 Finishing Melamin lack clear PU Daun Jendela        26.00 unit  Rp        185,000.00  Rp         4,810,000.00
JUMLAH II.9.  PEKERJAAN FINISHING KAYU  Rp       11,040,250.00
II.11 PEKERJAAN WATERPROOFING
1 Waterproofing Dak Beton        36.75 m2  Rp        125,000.00  Rp         4,593,750.00
JUMLAH II.11.  PEKERJAAN WATERPROOFING  Rp         4,593,750.00
JUMLAH  PEKERJAAN LANTAI 02  Rp     185,111,692.50
III. PEKERJAAN LANTAI 3
III.1 PEKERJAAN BETON NON STRUKTURAL 
1 Kolom Praktis          0.36 m3  Rp    3,221,875.00  Rp         1,159,875.00
2 Balok Ring          0.66 m3  Rp    3,221,875.00  Rp         2,126,437.50
JUMLAH III.1.  PEKERJAAN BETON NON STRUKTURAL  Rp         3,286,312.50
III.2 PEKERJAAN PASANGAN
1 Pasang Dinding Batu Bata        25.30 m2  Rp          95,000.00  Rp         2,403,500.00
JUMLAH III.2.  PEKERJAAN PASANGAN  Rp         2,403,500.00
III.3 PEKERJAAN PENUTUP DINDING
1 Plesteran & Acian        53.13 m2  Rp          47,500.00  Rp         2,523,675.00
2 Pasang Rooster          8.80 m2  Rp          10,000.00  Rp               88,000.00
JUMLAH III.3.  PEKERJAAN PENUTUP DINDING  Rp         2,611,675.00
III.5 PEKERJAAN PENUTUP LANTAI
1 Screed dan floor hardener        70.00 m2  Rp          87,500.00  Rp         6,125,000.00
JUMLAH III.5.  PEKERJAAN PENUTUP LANTAI  Rp         6,125,000.00
III.6 PEKERJAAN CAT
1 Cat Dinding Interior        26.57 m2  Rp          27,500.00  Rp             730,537.50
2 Cat Dinding Exterior        26.57 m2  Rp          29,500.00  Rp             783,667.50
JUMLAH III.6.  PEKERJAAN CAT  Rp         1,514,205.00
III.11 PEKERJAAN WATERPROOFING
1 Waterproofing Lantai        70.00 m2  Rp        125,000.00  Rp         8,750,000.00
JUMLAH III.11.  PEKERJAAN WATERPROOFING  Rp         8,750,000.00
III.12 PEKERJAAN ATAP
1 Pasang Roof Drain          4.00 bh  Rp        200,000.00  Rp             800,000.00
JUMLAH III.12.  PEKERJAAN WATERPROOFING  Rp             800,000.00
JUMLAH  PEKERJAAN LANTAI 03  Rp       25,490,692.50
IV. PEKERJAAN LAIN - LAIN
IV.2 PEKERJAAN RAILLING
1 Railling  Void        12.00 m1  Rp        750,000.00  Rp         9,000,000.00
2 Railling tangga          9.50 m1  Rp        550,000.00  Rp         5,225,000.00
JUMLAH IV.2.  PEKERJAAN RAILLING  Rp       14,225,000.00
IV.3 PEKERJAAN FASADE
1 Ban-banan Fasade      136.00 m1  Rp          75,000.00  Rp       10,200,000.00
2 Kubah Masjid dari GRC          1.00 bh  Rp  10,000,000.00  Rp       10,000,000.00
3 Plat topi-topi        17.00 unit  Rp        300,000.00  Rp         5,100,000.00
JUMLAH IV.3.  PEKERJAAN FASADE  Rp       25,300,000.00
IV.4 PEKERJAAN DRAINAGE
1 Sumur Air Bersih          1.00 unit  Rp    5,000,000.00  Rp         5,000,000.00
2 Sumur Resapan          2.00 unit  Rp    1,500,000.00  Rp         3,000,000.00
3 Septic Tank          1.00 unit  Rp    5,000,000.00  Rp         5,000,000.00
4 Reservoir          2.00 unit  Rp    1,000,000.00  Rp         2,000,000.00
JUMLAH IV.4.  PEKERJAAN DRAINAGE  Rp       15,000,000.00
JUMLAH  PEKERJAAN LAIN-LAIN  Rp       54,525,000.00
JUMLAH TOTAL (Belum Termasuk Jasa dan Pajak)  Rp     566,492,704.06